SOLAR ROOF MOUNTING

Folding tripod for flat roofs

Install front reading:

►Prohibited operations in the situation of storm, typhoon, hurricane, earthquake, volcanic eruption and other inclement weather and natural environment disaster.
►Surface mounting operations do not sit on the solar battery board.
►As a high-altitude operations, please strictly abide by the safety specification for high-altitude operation.
►If charged operation, please strictly abide by the safety specification for live working.
►If there is fever homework, please strictly abide by the safety operation specification high fever.
►Please use the qualified tools installed, if the specified tool, please in strict accordance with the requirements specified tool installation.
►When installed, should be strictly in accordance with the requirements of the specificationfor the installation.

►Installation location is determined by wind loads. Check with the local building and safety department for specific requirements. Check whether the roof structure can support the solar module array.
► If possible, install the solar modules facing south. It is also possible to install them facing east and west, although the amount of electricity generated will be lower.

Step 1: Assemble the three aluminium angles into a triangular set using M8 hexagon socket head bolts.
Step 2: The triangular set is fixed to the base (usually concrete) by means of M8 Allen bolts.
Step 3: The rails are mounted on top of the lined triangular set by means of fastening brackets. The rails can be extended by means of connecting fittings.
Step 4: The solar modules are placed on the rails, the sides are secured by the side fittings and the modules are secured between the two modules by pressing the inner fittings.

SOLAR ROOF MOUNTING

Pitched Roof Solar Mounting System

Installation instructions for wanhos solar system:

►Stop work during stormy weather. Solar modules can be caught in the wind, causing you to fall.
►Never step or sit on the glass surface of a solar module. The glass may break, resulting in shock or bodily injury. The module may also stop generating power.
►Always use the supplied parts to attach the solar modules and mounts. Use of weaker parts, such as screws that are too short, is dangerous and may cause the solar modules or mounts to fall.
►Always use the specified tools. The solar modules or mounts may fall if the installation is not strong enough, for example when parts are not tightened sufficiently.
►Do not modify or cut parts. Doing so is dangerous. Safety cannot be guaranteed.
►Product should be installed and maintained by qualified personnel. Keep unauthorized personnel away from solar modules

►Installation location is determined by wind loads. Check with the local building and safety department for specific requirements. Check whether the roof structure can support the solar module array.
► If possible, install the solar modules facing south. It is also possible to install them facing east and west, although the amount of electricity generated will be lower.

Step 1: The standard and dimensions of the panel determine the location of the hooks. The dimensions of the hooks are as follows:

a. The quantity of panels in one horizontal row is n. The W of the panel is D1 and the H is temporarily D2.

b.The distance between the centre points of the hooks in both front and rear rows L = 60%D1

c.Distance of the centre point from the first hook in the horizontal row to the last hook L1=n*D2+(n-1)*17mm

d.The position of the hooks on the inner side of the horizontal row is determined by the actual installation situation and the length of the rail. We suggest dividing the installation into equal sections. L2 = L1/2 as in the example shown in the diagram above.

e.Note: Distance between centre points of adjacent hooks L2<1200 mm.

Step 2: Take up the tiles on the beam.

Step 3: Fix the hooks to the top of the beam with wood screws.

Step 4: After the hooks have been installed, place the tiles back in their original position.

Step 5: Sequentially attach the rails to the hooks.

Step 6: Place the solar module on the rails, the sides are secured by the side fittings and the inner fittings are pressed between the two modules to secure the module.

SOLAR GROUND MOUNTING

Pole Mounting System

Install front reading:

►Prohibited operations in the situation of storm, typhoon, hurricane, earthquake, volcanic eruption and other inclement weather and natural environment disaster.
►Surface mounting operations do not sit on the solar battery board.
►As a high-altitude operations, please strictly abide by the safety specification for high-altitude operation.
►If charged operation, please strictly abide by the safety specification for live working.
►If there is fever homework, please strictly abide by the safety operation specification high fever.
►Please use the qualified tools installed, if the specified tool, please in strict accordance with the requirements specified tool installation.
►When installed, should be strictly in accordance with the requirements of the specificationfor the installation.

►Step one:The front and rear foot mounted and fixed good, around one one corresponding, in a straight line.
►Step two:Connects the square bar installed on the front and rear foot with hanging lugs on the cap.
►Step three:The transverse tube is arranged in the front and rear foot, through the U type bolt will be fixed to the front and rearfoot horizontal tube.The side transverse pipe and the end surface of the front and rear foot flush.
►Step four:The guide rail is placed in the horizontal tube.
Position proportional guide rail size suggested values are as follows: (where D is the width of the solar batteryboard)The guide rail can be continuously connected extends through the guide rail connecting block.
►Step five:The U type bolt component will guide is fixed on the transverse tube.
►Step six:The first solar panel is placed on the bracket as shown in the diagram, with two sets of pressure block assembly,locking, fixed it in place.
►Step seven:Similarly, the solar battery plate are respectively installed on the rest of the bracket, two plates of adjacent by medium pressure fixed,
The side by side pressure fixed. Lock with method of medium voltage and rail lock matched method and lateral pressure and the guide rail is similar.

SOLAR GROUND MOUNTING

UB-Ground Mounting System

Install front reading:

►Prohibited operations in the situation of storm, typhoon, hurricane, earthquake, volcanic eruption and other inclement weather and natural environment disaster.
►Surface mounting operations do not sit on the solar battery board.
►As a high-altitude operations, please strictly abide by the safety specification for high-altitude operation.
►If charged operation, please strictly abide by the safety specification for live working.
►If there is fever homework, please strictly abide by the safety operation specification high fever.
►Please use the qualified tools installed, if the specified tool, please in strict accordance with the requirements specified tool installation.
►When installed, should be strictly in accordance with the requirements of the specificationfor the installation.

►Step one:The front and rear foot mounted and fixed good, around one one corresponding, in a straight line.
►Step two:Connects the square bar installed on the front and rear foot with hanging lugs on the cap.
►Step three:The transverse tube is arranged in the front and rear foot, through the U type bolt will be fixed to the front and rearfoot horizontal tube.The side transverse pipe and the end surface of the front and rear foot flush.
►Step four:The guide rail is placed in the horizontal tube.
Position proportional guide rail size suggested values are as follows: (where D is the width of the solar batteryboard)The guide rail can be continuously connected extends through the guide rail connecting block.
►Step five:The U type bolt component will guide is fixed on the transverse tube.
►Step six:The first solar panel is placed on the bracket as shown in the diagram, with two sets of pressure block assembly,locking, fixed it in place.
►Step seven:Similarly, the solar battery plate are respectively installed on the rest of the bracket, two plates of adjacent by medium pressure fixed,
The side by side pressure fixed. Lock with method of medium voltage and rail lock matched method and lateral pressure and the guide rail is similar.