Solar Ground Mount

Wanhos Solar Ground Mount Systems for Commercial & Utility Projects

Engineered for open sites, unused industrial land, and utility-scale installations, Wanhos ground-mounted solar systems deliver maximum structural stability for large-scale energy projects. We provide high-strength aluminum and galvanized steel racking solutions tailored to diverse commercial requirements. Every system is fully customizable—optimized for site-specific tilt angles, local wind/snow loads, and unique geographical conditions to ensure code compliance and long-term performance.

01 / Select the right structure

Two systems.
Clear engineering choices.

Compare the actual component families before specifying the project. Foundation methods, rails and module clamps stay with their respective system.

ZAM steel systemView system details
ZAM installation manualAssembly detail
ZAM steel. A driven-column structure. Assembly illustration extracted from supplied manual.
Engineering drawing excerpt from the ZAM installation manual
Original manual excerpt.
Dimensions shown relate to the illustrated configuration; request the drawing for your site.

ZAM steel. A driven-column structure.

A C-section support frame built around the C150 column, Tri Splice Kit and coordinated rail connections. The installation manual specifies columns driven directly into the ground.

Primary column
C150×75×6
Joint system
C-AT-L200 · Tri Splice Kit
Main beam / diagonal brace
C-80×50×1.5
Rail / rail splice
WHS-CS1 / WHS-CS1-SP
Rail clamp / back ribs
WHS-CD1 / WHS-CS-01
Inter / end clamp
WIC-F35 / WEC-F35
Foundation method
Driven columns · depth per project drawing
Request ZAM drawing package
Aluminum systemView system details
Aluminum installation manual · 2016Assembly detail
Aluminum. Pre-assembled for site work. Assembly illustration extracted from supplied manual.
Engineering drawing excerpt from the Aluminum installation manual · 2016
Original manual excerpt.
Dimensions shown relate to the illustrated configuration; request the drawing for your site.

Aluminum. Pre-assembled for site work.

The aluminum manual specifies factory-preassembled support brackets and separate ground screw or concrete-base arrangements. Rail and clamp selections belong to this system’s component schedule.

Beam
WAG-BA4-length
Support tubes
WAG-T4-length / WAG-T3-length
Bottom base
WAG-B2
Rail / rail clamp
WBR-02-length / WBR-C50
Inter / end clamp
WIC-F40 / WEC-F40
Ground screw option
WN76-1600
Concrete base option
Embedded anchor bolts · per approved design
Request aluminum drawing package

For your quotation, confirm the material grade and coating specification alongside site loads, corrosion exposure, module format and foundation design. These are project inputs, not universal system ratings.

Compare the two documented configurations
Selection pointZAM steel systemAluminum system
Foundation routeColumns driven with piling equipmentGround screws or concrete bases
Frame assemblyColumn, brace and main beam connected on sitePre-assembled brackets prepared in the factory
Rail connectionWHS-CS1-SP splice kitsRail splice with M6.3×25 self-drilling screws in the manual
Module clampsWIC-F35 / WEC-F35WIC-F40 / WEC-F40

02 / Component anatomy

The right part.
At every connection.

Explore six component groups for each system. Images and item references come from the supplied WANHOS installation manuals.

ZAM steel systemView system details
01Primary column — original manual illustration

Primary column

C150×75×6

Driven column forms the primary support. Orientation, spacing and embedment follow the project drawing.

Request detail · Item 01
02Tri Splice Kit — original manual illustration

Tri Splice Kit

C-AT-L200

Connects the C steel diagonal brace to the column, as shown in the manual’s assembly sequence.

Request detail · Item 02
03Main beam & diagonal brace — original manual illustration

Main beam & diagonal brace

C-80×50×1.5

The beam and brace share the listed section designation. Their roles and connections remain distinct.

Request detail · Item 03–04
04Rail & splice assembly — original manual illustration

Rail & splice assembly

WHS-CS1 / WHS-CS1-SP

The L-profile rail connects to the beam with WHS-CD1 rail clamps; the dedicated splice joins rails.

Request detail · Item 05–07
Aluminum systemView system details
01Beam & pre-assembled bracket — original manual illustration

Beam & pre-assembled bracket

WAG-BA4-length

Factory-preassembled brackets reduce frame assembly work on site. Final lengths follow the project layout.

Request detail · Item 01
02Support tubes — original manual illustration

Support tubes

WAG-T4-length / WAG-T3-length

Two tube references form part of the aluminum support assembly shown in the accessories schedule.

Request detail · Item 03 / 05
04Ground screw — original manual illustration

Ground screw

WN76-1600

The manual lists a ground screw foundation option. Site suitability and installation acceptance require project review.

Request detail · Item 06
05Rail & rail clamp — original manual illustration

Rail & rail clamp

WBR-02-length / WBR-C50

The rail attaches to the bracket using its designated clamp. Rail extensions use the specified splice detail.

Request detail · Item 02 / 09
06Module clamps — original manual illustration

Module clamps

WIC-F40 / WEC-F40

This aluminum configuration uses the F40 clamp family. Do not substitute the ZAM system’s F35 listing.

Request detail · Item 07–08

03 / Real project references

Real projects.
From structure to solar.

From support frames on site to module arrays across a Japanese landscape, see WANHOS mounting systems in real project settings.

WANHOS ground mounting framework with repeated support rows, diagonal braces and rails before module installation
WANHOS project photograph

01 / On-site structure

Ground mounting framework

A field view of the support structure before module placement. Repeated bays, diagonal bracing and aligned rails show how the mounting frame comes together on site.

Project view
Structure installed
Visible detail
Braced support frames
Array layout
Repeated mounting rows
Discuss your mounting layout
Aerial photograph of a WANHOS solar project in Japan, with several module fields and access routes surrounded by woodland
WANHOS project photograph

02 / Japan

Ground-mounted solar in Japan

An aerial view of a Japanese ground-mounted solar project. Module rows occupy several distinct areas, with access routes between the arrays and woodland around the site.

Location
Japan
Project view
Installed module arrays
Array layout
Multiple solar fields
Plan a site-specific project
WANHOS ground mounting project showing tilted solar module tables, exposed support frames and open aisles during installation
WANHOS project photograph

03 / Module installation

From support frame to module table

An installation view showing module tables alongside exposed support frames. The visible connections and space between rows bring the assembly process into focus.

Project view
On-site installation
Visible detail
Tilted module tables
Site layout
Open space between rows
Request installation details

Planning a similar installation? Share your site location, module layout and foundation requirements.

Discuss your project

04 / Installation planning

A clear sequence.
A better-prepared crew.

See the documented assembly route for each system. Use the approved project manual for torque settings, embedment, spacing and installation acceptance.

ZAM steel systemView system details
  1. 01Set out & drive columns — installation manual detail

    Set out & drive columns

    Position columns at the spacing and depth shown on the engineering drawing. Keep the column opening direction consistent.

    Tools: Piling machine · tape · level

  2. 02Connect the support frame — installation manual detail

    Connect the support frame

    Fit the Tri Splice Kit and diagonal brace, then connect the main beam to the column and brace.

    Tools: Sockets · torque wrench · hex key

  3. 03Fit rails & back ribs — installation manual detail

    Fit rails & back ribs

    Install the L-profile rails, rail clamps, splice kits and back ribs to complete the bracket assembly.

    Tools: Socket tools · tape · torque wrench

  4. 04Install modules & clamps — installation manual detail

    Install modules & clamps

    Position modules and install the end and inter clamps. Complete checks against the approved installation package.

    Tools: Hex key · calibrated torque wrench

Aluminum systemView system details
  1. 01Prepare the foundations — installation manual detail

    Prepare the foundations

    Set out the approved ground screw or concrete base arrangement. Confirm position and height before mounting brackets.

    Tools: Survey tools · foundation equipment

  2. 02Place pre-assembled brackets — installation manual detail

    Place pre-assembled brackets

    Position the factory-preassembled bracket on the base connection, align the frame and secure the specified fasteners.

    Tools: Sockets · level · torque wrench

  3. 03Install & extend rails — installation manual detail

    Install & extend rails

    Fix the rails with rail clamps. Where extensions are required, follow the splice detail with M6.3×25 self-drilling screws.

    Tools: Electric drill/driver · socket tools

  4. 04Secure the modules — installation manual detail

    Secure the modules

    Fit the F40 end and inter clamp assemblies. Verify alignment and connections using the approved project instructions.

    Tools: Hex key · calibrated torque wrench

Plan the work before the first delivery.

Request the component schedule, assembly details and packing requirements for your project.

Request installation package

Your next ground mounting project

Start with your site.
Let’s plan the mounting.

Tell us what you’re building. We’ll help you work through the mounting configuration, project documents and quotation requirements.

  • 01
    Find the right configuration

    Discuss the structure and foundation options for your site.

  • 02
    Request your engineering package

    Ask for CAD drawings, a bill of materials and installation details.

  • 03
    Build a project quotation

    Align the mounting scope with your procurement and delivery needs.

A useful starting point:
Project country, planned capacity, module format and preferred foundation.

Get a project proposal

Share your project details using the form below.

    Have a module datasheet or site layout? Mention it in your enquiry so it can be included in the project review.